- Overview
- Features
- Application
- Product Dimension
- Installation way
- Packaging
- Attention
- FAQ
Basic Info.
Packaging & Delivery
Product Description
Product Code | xhz-13-15 | xhz-13-110 | |||||||
Input Wattage | 40W-80W | 80W-150w | |||||||
Color Temperature | 2700~6500K | 2700~6500K | |||||||
Luminous Flux | 6500-7000lm | 13000-15000lm | |||||||
Input Voltage | AC90~305V | AC90~305V | |||||||
Frequency Range | 50/60Hz | 50/60Hz | |||||||
Power Factor | PF≥0.95 | PF≥0.95 | |||||||
color rendering index | Ra≥70 | Ra≥70 | |||||||
Temperature of Working Condition | -40~50ºC | -40~50ºC | |||||||
Humidity of Working Condition | 20%~90%RH | 20%~90%RH | |||||||
LED Lifetime | 50000h | 50000h | |||||||
Protectin Grade | IP66 | IP66 | |||||||
Protection level | IK08/09/10 | IK08/09/10 | |||||||
Installation Pipe Diameter | φ60mm | φ60mm | |||||||
Installation Height | 4-6m | 5-8m | |||||||
Net Weight | 3.3kg | 43.9kg | |||||||
Gross Weight | 3.5kgs | 4.6kgs | |||||||
Packing Size(m m) | 444.3*184.6*127.1 | 499.2*233.9*126.9 |
. IP66 waterproof/dust proof/explosion proof/IK09
. Aluminum shape good at heat dissipation
. The lamp post can be adjusted to plus or minus 15 degrees It can also be installed vertically
. SMD 3030/ 5050/ Ra>70/SDCM<6
. 100,000 times switching cycle before failure
. Total harmonic distortion (THD)<10%
. Excellent post light control design, the whole lamp can achieve T II-M, T III-M,That's our advantage
. Pass 3G vibration test
It is mainly applied to the road lighting of urban expressway,secondary trunk road, branch road, factory, school, garden, various residential
communities and courtyards. The installation height is 6-13m and the installation torque is 16Nm.
Matters needing attention
Before installing the lighting fixtures, please read this instruction manual carefully.
The lighting fixtures should be installed, connected and tested by a certified electrician based on the local regulations.
Lamps should always be installed or replaced carefully.
Please check the local voltage in accordance with the product requirements before installation.
Revamping only can be done when the power is off and the lamp is completely cooled down.
When clean the lamp, make the power off and let it cool down completely, clean the fixture with a soft cloth and a standard PH neutral detergent, stainless steel should be maintained regularly.
Don't cover the fixtures with flammable materials.
Replace should be made by the manufacturer or his service agent or certified electrician in order to avoid a hazard.
This specification is for reference only,we reserve the right to change without notice.
Q1. MOQ and delivery time ?
A: NO MOQ required, sample testing welcome.. Mixed samples are acceptable.Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than
Q2. How should I pay for my order?
A:We support payment by TT,LC.
Q3. Do you offer guarantee for the products?
A: Yes, we offer 2-5 years warranty to our products.
Q4. How about the shipping method ?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.
Q5. Will you deliver the right goods as ordered?How can I trust you?
A:Yes, we will.We have a good cooperation with a number of excellent material suppliers, and we will make sure our, products are 100% inspection before packing
Q6. How to deal with the faulty?
A: Firstly, Our products are produced in strict quality control system
Secondly, during the guarantee period, we will send new lights with new order for small quantity. For defective batch products, we will repair them and resend them to you or we can discuss the solution.