Basic Info.
Product Description
LUMILEDS LED Chips 500w AC85-277v 75000lm High Quality Stadium Lighting Sport Light LED Flood LightBest Outdoor Waterproof Ip66 Stadium High Mast Light Pole Tower For Sports
Advantages of LED stadium sports light
- The best adjustable flood light for project lighting, sport field, high masts, warehouse, display rack, tunnel, football field etc.
- The constant current Brand driver, very good on anti-surge, stable performance, 5 years warranty.
- Use the new generation Lumileds 5050SMD as Light Source, with the features of high brightness, low light decay, long lifespan.
- Provide a variety of beam angle options for different application scenarios.
- All sets of IES files support, Dialux program support.
- Waterproof IP66, outdoor use freely.
- Anti-glare cover and explosion-proof net can be added.
Data sheet
Model | PL-SD-070 | |
Power | 300~600W | 800~1200W |
Dimension(mm) | 480X470X448 | 533X540X463 |
Lumen efficiency (±5%) | 150lm/w | |
LED Source | 272PCS Lumileds 5050 | 420PCS Lumileds 5050 |
Input Voltage | AC100~277V/305V 50~60Hz | |
Power factor | >0.95 | |
THD | <20% (Typical : 10%) | |
Color Temperature | 4000K( 3000K 5000K 5700K 6500K Optional) | |
Color Rendering Index | CRI>70 | |
IP Rating&IK | IP66&IK08 | |
Beam Angle | 25°/45°/60° | |
Housing Color | Black | |
Working Life | >50,000 hours | |
Warranty | 5 years | |
Storage Environment | -40ºC~+85ºC, 10%~90% RH | |
Working Environment | -40ºC~+50ºC, 20%~90% RH | |
Body & Shade Material | Aluminum housing & Annular lens | |
Where Can Use | Applicable for Building external wall,square,project lighting, sport field, high masts, warehouse, display rack, tunnel, football field etc. |
FAQ
Q: Can we get a sample to test?
A : Yes , we can provide sample to you for testing, just please inform the specific models , size , power , color temperature.
Q: What's the delivery time?
A : Around 3~5 days after get payment for samples, 7-10 working days after get deposit for mass order.
Q: Do you have the technic supports ?
A: Of course, after you receive the lamps, if you have any questions, please tell us, We can try my best to help you .
Q: What's the payment term?
A : We accept TT , Western Union,L/C. For samples , full payment is required upon order confirmation. For mass orders, 30% deposit upon order confirmation and 70% balance before shippment.
Please read the instruction carefully before you use the product.We keep the right of final explanation for the instruction and the product.The product will keep updating continues.And sorry for the no notice for the updating.sure the Input voltage which is stable.
Q1. Can I have a sample order for led light?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q2. What about the lead time?
A:Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than
Q3. Do you have any MOQ limit for led light order?
A: Low MOQ, 1pc for sample checking is available
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.
Q5. How to proceed an order for led light?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.
Q6. Is it OK to print my logo on led light product?
A: Yes. Please inform us formally before our production and confirm the design firstly based on our sample.
Q7: Do you offer guarantee for the products?
A: Yes, we offer 2-5 years warranty to our products.
Q8: How to deal with the faulty?
A: Firstly, Our products are produced in strict quality control system and the defective rate will be less
than 0.2%.
Secondly, during the guarantee period, we will send new lights with new order for small quantity. For
defective batch products, we will repair them and resend them to you or we can discuss the solution i
ncluding re-call according to real situation.